How to debug multi-station cold heading machine

How to debug multiple workstationsCold heading machineNext, the cold heading machine manufacturer will briefly introduce it:

1. Press the emergency stop button on the control cabinet operation panel and the equipment stops running.

2. Pull off the total power supply and the data on the counter remains unchanged. After the power is re-sending, the equipment then processes the parts until it reaches the preset number.


3. Reset and press the two reset switches on the counter operation panel to reset the preset number and processing number respectively.

Notes on operating multi-station cold heading machine:

(1) The diameter of the steel bar or steel wire should meet the requirements of multi-station cold heading machine. No cold heading steel bars (wires) that are too thick or too thin;

(2) Within the allowable range of cold heading diameter of the cold heading machine, the position of the fixture (rotated in or out) can be adjusted according to the required anchor head size to obtain a suitable amount of steel bars (wire) protrusion;

(3) Rust removal and straightening must be carried out within the 120-130mm area of ​​the cold heading part of the steel bar (wire);

(4) The ends of the steel bars should be smoothed to ensure the accurate shape of the cold heading anchor head;

(5) After the steel bar is upset, tensile test must be carried out to check whether the strength of the anchor head is qualified.